5.10 Completion of Construction
FCHOA Declaration of Protective Covenants - Revision Date: 2022-05-20
All structures and landscaping must be substantially completed in accordance with the plans and specifications approved by the ARC within twelve (12) months after construction of same shall have commenced, except that the ARC may grant extensions where such completion is made impossible because of matters beyond the control of the Owner, such as strikes, casualty losses, labor or material shortages, national or state emergencies or acts of nature. In the event any structure is damaged or destroyed during or after construction, the Owner shall make every reasonable effort to rebuild the structure to its original condition as rapidly as possible, or, in any event, within twelve (12) months of the date such damage occurs.